Vault Door Installation

1-(800)543-1277

Installing your vault door is simple just follow the instructions below:

1. Prepare opening: The outside face of the wall with the proper size block-out opening for the vault door should be finished including any drywall, etc. Complete and ready to receive the vault door. The inside face of the wall may also be finished, The outside of the wall should be plumed.

2. Prepare the vault room: Provide enough light inside of the vault room and position at least one person inside the room with tool and bolts necessary to attach to the concrete wall.

3. Staging a vault door for lifting: Position the vault door flat on the floor, with the outside of the door facing up, so it can be raised to a vertical position at a right angle (90 degrees) to the opening. Then with appropriate help, raise the door to the vertical position.

 

back to resources...

E-mail us at: info@vaultdoors.org

© 2011 VaultDoors.org. All rights reserved
9612 Beverly road Pico Rivera, CA. 90660